Belmont Victorian | Opening the Entry
Season 35 Episode 6 | 23m 43s | Video has closed captioning.
Kevin meets mason Mark McCullough as he starts laying blocks for the mudroom foundation. Tommy builds a bay window in the kitchen. Norm visits the shop where the original windows are undergoing restoration. The front entryway is opened up.
Aired: 11/05/15
Expired: 09/28/16
Problems Playing Video? | Closed Captioning