Want to watch better-quality PBS Video? Sign in to access higher-quality streaming!

When you sign in, you'll become a PBS Insider and we'll share your contact information with your local PBS station. You may receive updates to help you stay connected with what's happening online and in your community. Privacy Policy

Closed Captioning Settings
×

Preview

Captions look like this

Captions size

  • 15

Captions font family

Edge style

Captions color

Background color

Window color

Text Opacity

  • 100%

Background Opacity

  • 100%

Window Opacity

  • 0%
  • Save Settings
  • Reset

AMERICAN EXPERIENCE

Building a Supply Road for the Pipeline

  • Aired: 05/15/2006
  • 01:09
  • Rating: NR
On April 29, 1974, construction began on a haul road that would link the Yukon River to Prudhoe Bay. Truckers would use the road throughout the construction of the pipeline to transport goods to the North Slope as well as to camps along the way. By fall, the 360-mile long road was ready and would be used to haul three million tons of pipe, machinery, spare parts, fuel and food for 2 1/2 years.
Embed Options
Close ×
Building a Supply Road for the Pipeline
Building a Supply Road for the Pipeline
On April 29, 1974, construction began on a haul road for transporting pipeline materials.
Width:
Height:
Please copy this text to your clipboard.
Problems Playing Video ?
Related Links:

PBS KIDS

Watch videos from your favorite PBS KIDS shows with the PBS KIDS Video app for your tablet or phone.

Downton Abbey Collection

Bring home the complete collection: DVDs, Blu-rays, books, gifts and more. Visit ShopPBS.

Donate

helps all of us explore new worlds and ideas. Give Now

Sponsored Links